Common mistakes in bill of quantities
A bill of quantities (sometimes referred to as 'BoQ' or 'BQ') is a document prepared by a cost consultant (often a quantity surveyor) that provides project-specific measured quantities of the items identified by the drawings and specifications in the tender documentation for construction works.
It is very important that bills of quantities are prepared according to a standard, widely recognised methodology. This helps avoid any ambiguities or misunderstandings and so helps avoid disputes arising through different interpretations of what has been priced.
However, there are some common mistakes that can be made in the bill of quantities. These include:
- Inaccurate measurement of quantities.
- The inclusion of irrelevant preliminary items (this can be due to using preliminary items from a previous project which, although it may be similar, contains differences in scope).
- Insufficient information given in the descriptions.
- Omissions and discrepancies between the BoQ and the drawings or specifications (perhaps due to out-of-date or inaccurate information being used).
- Omissions or double-counting of items (this can be due to more than one quantity surveyor working on the same bill).
- Omission of temporary works items.
There can also be errors made in the pricing, such as:
- Incorrect understanding of the work method.
- Past performance used to assume future productivity.
- Inexperience of the estimator.
- Ignoring the relationship between items of work.
- Changes that are made late in the process.
- Inaccurate assumptions regarding items in the BoQ.
- Arithmetic errors.
- Differences in currencies not considered.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Advantages of a bill of quantities.
- Approximate bill of quantities.
- Bill of quantities.
- Bill of quantities software.
- Common mistakes in construction tenders.
- Cost plans.
- Cost overruns.
- Elemental bill of quantities.
- Estimate.
- How to take off construction works.
- Measurement.
- Taking off.
- Types of bill of quantities.
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.